22 nov
|
European Southern Observatory
|
Cerro Paranal
22 nov
European Southern Observatory
Cerro Paranal
ESO seeks a PLC Engineer to support the AIV phase for the ELT at Paranal, Chile. You will verify and integrate Beckhoff-based control subsystems, assist in on-site assembly and commissioning, and work with international stakeholders to ensure a fully functional telescope.
Strong TwinCAT and EtherCAT experience are essential. The role demands extensive field experience, English fluency, and collaboration across cross-functional teams.
#J-18808-Ljbffr
📌 ELT PLC AIV Engineer – On-Site Beckhoff/TwinCAT (Cerro Paranal)
🏢 European Southern Observatory
📍 Cerro Paranal